determine the quantity of work done when a crane lifts a 100-n and block from 2 m above the ground to a 6 m above the ground

Answer: 400 J
Explanation :
Given that,
Force = 100 N
Distance = 6 m - 2 m = 4 m
Now , the work done is equal to the multiplication of the force and distance.
W = F * d
[tex]W = 100\ N\times 4\ m[/tex]
[tex]W = 400 J[/tex]
Hence, the quantity of work done is 400 J